prosolis
3b4dfa44d3
Adv 2.0 L2: rip legacy arena combat path; boss flow is the only path
...
Cancels the planned ARENA_BOSS_FLOW soak. The boss flow is shipped
unconditionally with no legacy fallback — boss-flow errors now surface
to the player and abort the round rather than silently falling back to
the old CombatPower path.
Deleted:
- runArenaCombat (combat_bridge.go) — legacy CombatPower-vs-Lethality
arena combat driver.
- RenderCombatLogArena, renderArenaOutcome (combat_narrative.go) — legacy
arena renderers. RenderCombatLogArena was a thin alias for
RenderCombatLog; renderArenaOutcome was already dead.
- renderArenaCombatFinalMessage (combat_bridge.go) — legacy "rewards +
closer" trailing text.
- arenaWinCloser, arenaLoseCloser (adventure_arena_combat.go) — flavor
helpers that only fed the deleted renderers. File now just holds
arenaParticipationXP.
- arenaBossFlowEnabled + the ARENA_BOSS_FLOW env var (adventure_arena.go,
.env.example). The env gate served only the now-removed fallback.
- sendArenaCombatMessages (adventure_arena.go) — wrapper that switched
pacing between boss flow and legacy. Replaced with direct
sendZoneCombatMessages calls at the three call sites.
- TestArenaBossFlowEnabled (bossflow test) and
TestRenderCombatLogArena_ProducesPhaseMessages (narrative test).
Simplified resolveArenaRound / resolveArenaSurvival / resolveArenaDeath:
the bossNarr-vs-nil branches collapsed since narration is now always
produced by resolveArenaBoss. Equipment degradation and the death-save
reprieve hook are unchanged — both already worked off the boss-flow
CombatResult.
Migration doc (§4) updated to record the cancellation and the
remaining tuning approach (playtest-driven, no flag soak window).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-09 14:25:22 -07:00
..
2026-04-18 01:06:50 -07:00
2026-04-26 07:57:31 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-04-26 07:57:31 -07:00
2026-05-09 14:25:21 -07:00
2026-04-08 15:50:28 -07:00
2026-04-18 01:05:22 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-04-05 17:04:03 -07:00
2026-04-05 17:04:03 -07:00
2026-03-27 21:26:19 -07:00
2026-04-28 22:37:04 -07:00
2026-04-10 16:50:49 -07:00
2026-04-08 00:24:51 -07:00
2026-04-24 22:23:58 -07:00
2026-04-08 23:01:39 -07:00
2026-04-10 16:50:49 -07:00
2026-04-05 17:04:03 -07:00
2026-04-05 17:04:03 -07:00
2026-04-05 17:04:03 -07:00
2026-03-26 09:22:02 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-03-27 21:26:19 -07:00
2026-05-09 14:25:22 -07:00
2026-04-10 16:50:49 -07:00
2026-04-24 22:23:58 -07:00
2026-04-24 22:23:58 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-04-10 16:50:49 -07:00
2026-04-10 16:50:49 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-04-08 15:50:28 -07:00
2026-05-09 14:25:21 -07:00
2026-04-08 22:41:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-04-08 17:04:40 -07:00
2026-03-31 18:47:49 -07:00
2026-05-09 14:25:22 -07:00
2026-03-27 21:26:19 -07:00
2026-03-26 09:22:02 -07:00
2026-04-18 01:07:25 -07:00
2026-04-18 01:07:25 -07:00
2026-04-18 01:05:22 -07:00
2026-05-09 14:25:22 -07:00
2026-04-18 01:05:22 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-04-18 01:05:22 -07:00
2026-04-18 01:05:22 -07:00
2026-04-08 17:04:40 -07:00
2026-04-26 07:58:13 -07:00
2026-04-26 09:01:29 -07:00
2026-05-09 14:25:21 -07:00
2026-04-28 22:28:23 -07:00
2026-04-28 22:28:23 -07:00
2026-05-09 14:25:22 -07:00
2026-04-26 09:14:45 -07:00
2026-04-26 19:12:22 -07:00
2026-04-28 22:28:23 -07:00
2026-04-26 07:58:13 -07:00
2026-04-28 22:28:23 -07:00
2026-03-26 09:22:02 -07:00
2026-04-08 17:04:40 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-04-08 17:04:40 -07:00
2026-04-18 16:06:28 -07:00
2026-03-26 09:22:02 -07:00
2026-03-26 23:38:06 -07:00
2026-03-26 23:38:06 -07:00
2026-03-26 23:38:06 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-03-26 09:22:02 -07:00
2026-05-09 14:25:21 -07:00
2026-03-26 09:22:02 -07:00
2026-04-08 17:04:40 -07:00
2026-04-18 01:07:25 -07:00
2026-04-08 17:04:40 -07:00
2026-03-26 09:22:02 -07:00
2026-03-22 10:09:57 -07:00
2026-04-18 01:06:50 -07:00
2026-03-26 09:22:02 -07:00
2026-03-26 09:22:02 -07:00
2026-05-09 14:25:21 -07:00
2026-03-26 09:22:02 -07:00
2026-03-26 09:22:02 -07:00
2026-04-18 14:11:59 -07:00
2026-04-18 01:06:50 -07:00
2026-04-18 14:11:59 -07:00
2026-04-18 14:11:59 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-03-10 16:58:15 -07:00
2026-04-26 10:09:32 -07:00
2026-04-08 17:04:40 -07:00
2026-04-08 17:04:40 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-03-27 21:26:19 -07:00
2026-03-27 11:55:47 -07:00
2026-03-30 17:11:45 -07:00
2026-04-08 17:04:40 -07:00
2026-03-26 09:22:02 -07:00
2026-04-08 17:04:40 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-03-30 17:11:45 -07:00
2026-03-11 00:45:25 -07:00
2026-03-08 18:25:18 -07:00
2026-03-27 11:55:47 -07:00
2026-03-26 09:22:02 -07:00
2026-03-10 18:08:05 -07:00
2026-04-08 17:04:40 -07:00
2026-03-08 18:25:18 -07:00
2026-04-18 01:07:25 -07:00
2026-04-08 17:04:40 -07:00
2026-03-26 09:22:02 -07:00
2026-03-11 00:45:25 -07:00
2026-04-10 16:50:49 -07:00
2026-03-08 18:25:18 -07:00
2026-04-08 17:04:40 -07:00
2026-04-18 01:07:25 -07:00
2026-03-29 20:51:28 -07:00
2026-03-29 09:27:00 -07:00
2026-04-18 01:07:25 -07:00
2026-04-08 17:04:40 -07:00
2026-04-08 17:04:40 -07:00
2026-04-26 10:09:32 -07:00
2026-03-11 00:45:25 -07:00
2026-03-29 16:24:59 -07:00
2026-03-26 09:22:02 -07:00
2026-04-01 18:58:33 -07:00
2026-04-10 16:50:49 -07:00
2026-03-29 16:24:59 -07:00
2026-04-18 01:07:25 -07:00
2026-04-08 17:04:40 -07:00
2026-04-08 15:24:49 -07:00