prosolis
dcd9e4158f
Phase 4a (diag): per-zone outlier attribution
...
The Phase 3-B sweep wrung out the global lever surface and named four
zones that read ~0% completion under every (elite-threshold, drift,
nick-floor, supply-burn) combo: crypt_valdris T1, forest_shadows T2,
manor_blackspire T3, abyss_portal T5. Each has a healthy sibling at
the same tier (goblin_warrens 44%, sunken_temple 13.5%, underforge
2.5%, dragons_lair 57.5%) so the gap is per-zone, not tier-wide.
Adds a structured per-fight trace hook (traceFightStruct + the
harnessFightTrace struct that mirrors the existing string trace) so
diagnostics can aggregate without parsing the formatted log line.
Mirror-format with traceFight; if a field is added, update both
paths.
TestExpeditionBalance_Phase4A_OutlierDiagnostic walks the four
outlier-vs-sibling pairs at 200 trials each on the Phase 3-A/3-B best
cell (e=23 d=1 burn=50) and reports per-monster appearances /
win-rate / avg HP loss / kill attribution + day-of-end histogram +
elite-vs-standard fight mix.
Findings:
- crypt_valdris: dual-killer elite pool (Wight 99 kills, Flameskull
68). Phase 2c left this zone untouched ("already dual-elite") but
both elites are over-tier for T1.
- forest_shadows: standard pool too lethal — Displacer Beast (53
kills, 38% win standard) + Bandit Captain (48 kills, 57% win).
- manor_blackspire: Wraith on the standard slot is dragging the
floor (85 kills, 45hp loss per win). Vampire Spawn + Revenant
elite pair is also rough.
- abyss_portal: Nalfeshnee mis-classified standard (86 kills, 2.8%
win at L17). Vrock at 79% win is borderline.
Phase 4-B applies per-zone roster tweaks (IsElite re-flag, drop a
deadly entry, soften a SpawnWeight) — no monster stat-block changes.
T3 may need a follow-up tier-wide pass since the sibling underforge
also sits at 2.5%; out of scope here.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-15 11:18:44 -07:00
..
2026-05-13 23:00:35 -07:00
2026-05-09 14:25:23 -07:00
2026-05-12 21:59:19 -07:00
2026-05-09 14:25:22 -07:00
2026-05-13 22:53:58 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-15 08:03:42 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:23 -07:00
2026-04-26 07:57:31 -07:00
2026-05-09 14:25:23 -07:00
2026-04-08 15:50:28 -07:00
2026-05-12 21:59:19 -07:00
2026-05-14 18:38:57 -07:00
2026-05-14 08:01:10 -07:00
2026-05-09 14:25:21 -07:00
2026-04-05 17:04:03 -07:00
2026-04-05 17:04:03 -07:00
2026-03-27 21:26:19 -07:00
2026-04-28 22:37:04 -07:00
2026-04-10 16:50:49 -07:00
2026-05-09 21:32:47 -07:00
2026-04-24 22:23:58 -07:00
2026-04-08 23:01:39 -07:00
2026-04-10 16:50:49 -07:00
2026-04-05 17:04:03 -07:00
2026-04-05 17:04:03 -07:00
2026-04-05 17:04:03 -07:00
2026-05-12 21:59:19 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-03-27 21:26:19 -07:00
2026-05-09 21:32:47 -07:00
2026-04-10 16:50:49 -07:00
2026-05-09 14:25:23 -07:00
2026-05-09 14:25:23 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:23 -07:00
2026-05-09 14:25:22 -07:00
2026-05-13 22:53:58 -07:00
2026-05-12 21:59:19 -07:00
2026-05-09 14:25:23 -07:00
2026-05-09 14:25:22 -07:00
2026-05-14 08:01:10 -07:00
2026-05-14 21:19:31 -07:00
2026-04-08 15:50:28 -07:00
2026-05-14 22:37:47 -07:00
2026-04-08 22:41:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-15 07:11:40 -07:00
2026-04-08 17:04:40 -07:00
2026-03-31 18:47:49 -07:00
2026-05-09 14:25:22 -07:00
2026-05-14 15:28:42 -07:00
2026-05-14 15:28:42 -07:00
2026-05-14 15:28:42 -07:00
2026-05-14 08:59:51 -07:00
2026-05-14 07:44:01 -07:00
2026-05-14 22:06:31 -07:00
2026-05-14 18:00:29 -07:00
2026-05-14 18:00:29 -07:00
2026-03-27 21:26:19 -07:00
2026-03-26 09:22:02 -07:00
2026-04-18 01:07:25 -07:00
2026-05-09 14:25:23 -07:00
2026-05-12 21:54:40 -07:00
2026-04-18 01:07:25 -07:00
2026-05-09 17:23:08 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:23 -07:00
2026-05-09 14:25:22 -07:00
2026-05-15 08:03:42 -07:00
2026-05-14 07:53:17 -07:00
2026-05-14 22:37:47 -07:00
2026-05-12 21:59:19 -07:00
2026-05-13 23:00:35 -07:00
2026-04-18 01:05:22 -07:00
2026-05-14 23:17:12 -07:00
2026-05-09 14:25:22 -07:00
2026-05-14 08:59:51 -07:00
2026-05-13 23:05:33 -07:00
2026-05-14 06:30:52 -07:00
2026-05-14 18:38:57 -07:00
2026-05-14 08:08:26 -07:00
2026-05-14 08:59:51 -07:00
2026-05-12 21:59:19 -07:00
2026-05-12 21:59:19 -07:00
2026-05-14 08:59:51 -07:00
2026-04-08 17:04:40 -07:00
2026-03-26 09:22:02 -07:00
2026-04-08 17:04:40 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-12 21:59:19 -07:00
2026-05-09 14:25:22 -07:00
2026-05-12 21:59:19 -07:00
2026-05-14 22:06:31 -07:00
2026-05-12 21:59:19 -07:00
2026-05-14 22:17:03 -07:00
2026-05-14 20:32:41 -07:00
2026-05-14 20:00:00 -07:00
2026-05-12 21:59:19 -07:00
2026-05-14 14:43:05 -07:00
2026-05-12 21:59:19 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-13 22:53:06 -07:00
2026-05-13 22:53:06 -07:00
2026-05-14 22:37:47 -07:00
2026-05-14 22:37:47 -07:00
2026-05-14 23:13:01 -07:00
2026-05-14 23:13:01 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 17:21:33 -07:00
2026-05-09 14:25:22 -07:00
2026-05-14 23:02:53 -07:00
2026-05-14 23:13:01 -07:00
2026-05-09 14:25:22 -07:00
2026-05-15 11:10:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-14 08:01:10 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-13 22:53:58 -07:00
2026-05-13 22:53:58 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 17:17:19 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-15 11:10:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 15:17:30 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-14 22:17:03 -07:00
2026-05-12 21:59:19 -07:00
2026-05-14 21:30:15 -07:00
2026-05-12 21:59:19 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-14 19:47:01 -07:00
2026-05-09 14:25:22 -07:00
2026-05-12 21:59:19 -07:00
2026-05-12 21:59:19 -07:00
2026-05-14 22:06:31 -07:00
2026-05-14 22:17:03 -07:00
2026-05-14 22:37:47 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-14 07:12:37 -07:00
2026-05-09 14:25:21 -07:00
2026-05-15 07:18:16 -07:00
2026-05-14 21:30:15 -07:00
2026-05-09 14:25:21 -07:00
2026-05-15 07:18:16 -07:00
2026-05-14 21:53:06 -07:00
2026-05-14 15:18:18 -07:00
2026-05-14 22:17:03 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-14 22:17:03 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:22 -07:00
2026-05-14 18:38:57 -07:00
2026-05-14 15:18:29 -07:00
2026-05-14 19:47:01 -07:00
2026-05-14 20:32:41 -07:00
2026-05-12 21:59:19 -07:00
2026-05-14 06:16:45 -07:00
2026-05-09 14:25:22 -07:00
2026-05-15 10:01:07 -07:00
2026-05-09 14:25:22 -07:00
2026-05-14 22:06:31 -07:00
2026-05-09 15:17:30 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-12 21:59:19 -07:00
2026-05-09 15:17:30 -07:00
2026-05-09 14:25:22 -07:00
2026-05-14 22:37:47 -07:00
2026-05-12 21:59:19 -07:00
2026-05-12 21:59:19 -07:00
2026-05-12 21:59:19 -07:00
2026-05-09 17:21:33 -07:00
2026-05-09 14:25:22 -07:00
2026-05-09 14:25:22 -07:00
2026-05-15 10:45:40 -07:00
2026-05-14 22:06:31 -07:00
2026-04-08 17:04:40 -07:00
2026-05-09 21:37:29 -07:00
2026-05-14 23:28:54 -07:00
2026-05-14 23:28:54 -07:00
2026-05-15 11:18:44 -07:00
2026-05-15 11:18:44 -07:00
2026-03-26 09:22:02 -07:00
2026-03-26 23:38:06 -07:00
2026-03-26 23:38:06 -07:00
2026-03-26 23:38:06 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-03-26 09:22:02 -07:00
2026-05-09 14:25:21 -07:00
2026-03-26 09:22:02 -07:00
2026-04-08 17:04:40 -07:00
2026-04-18 01:07:25 -07:00
2026-04-08 17:04:40 -07:00
2026-03-26 09:22:02 -07:00
2026-03-22 10:09:57 -07:00
2026-04-18 01:06:50 -07:00
2026-03-26 09:22:02 -07:00
2026-03-26 09:22:02 -07:00
2026-05-09 14:25:21 -07:00
2026-03-26 09:22:02 -07:00
2026-03-26 09:22:02 -07:00
2026-04-18 14:11:59 -07:00
2026-04-18 01:06:50 -07:00
2026-04-18 14:11:59 -07:00
2026-04-18 14:11:59 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-03-10 16:58:15 -07:00
2026-04-26 10:09:32 -07:00
2026-04-08 17:04:40 -07:00
2026-04-08 17:04:40 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-09 14:25:21 -07:00
2026-05-14 22:37:47 -07:00
2026-05-14 22:37:47 -07:00
2026-05-14 22:37:47 -07:00
2026-05-14 18:00:29 -07:00
2026-05-14 18:00:29 -07:00
2026-03-27 21:26:19 -07:00
2026-03-27 11:55:47 -07:00
2026-03-30 17:11:45 -07:00
2026-04-08 17:04:40 -07:00
2026-03-26 09:22:02 -07:00
2026-04-08 17:04:40 -07:00
2026-05-09 14:25:23 -07:00
2026-05-09 14:25:23 -07:00
2026-05-09 14:25:21 -07:00
2026-05-15 08:03:42 -07:00
2026-05-09 14:25:23 -07:00
2026-05-09 14:25:23 -07:00
2026-03-11 00:45:25 -07:00
2026-03-08 18:25:18 -07:00
2026-03-27 11:55:47 -07:00
2026-03-26 09:22:02 -07:00
2026-03-10 18:08:05 -07:00
2026-04-08 17:04:40 -07:00
2026-03-08 18:25:18 -07:00
2026-05-09 20:20:56 -07:00
2026-05-12 21:59:19 -07:00
2026-04-08 17:04:40 -07:00
2026-03-26 09:22:02 -07:00
2026-03-11 00:45:25 -07:00
2026-04-10 16:50:49 -07:00
2026-03-08 18:25:18 -07:00
2026-04-08 17:04:40 -07:00
2026-04-18 01:07:25 -07:00
2026-03-29 20:51:28 -07:00
2026-03-29 09:27:00 -07:00
2026-04-18 01:07:25 -07:00
2026-04-08 17:04:40 -07:00
2026-04-08 17:04:40 -07:00
2026-04-26 10:09:32 -07:00
2026-03-11 00:45:25 -07:00
2026-03-29 16:24:59 -07:00
2026-03-26 09:22:02 -07:00
2026-04-01 18:58:33 -07:00
2026-04-10 16:50:49 -07:00
2026-03-29 16:24:59 -07:00
2026-04-18 01:07:25 -07:00
2026-04-08 17:04:40 -07:00
2026-04-08 15:24:49 -07:00
2026-05-09 17:00:57 -07:00
2026-05-09 17:00:57 -07:00
2026-05-09 17:17:19 -07:00
2026-05-09 17:17:19 -07:00
2026-05-09 16:59:32 -07:00
2026-05-09 16:59:32 -07:00
2026-05-09 16:57:48 -07:00
2026-05-09 16:57:48 -07:00
2026-05-09 16:51:19 -07:00
2026-05-09 16:51:19 -07:00
2026-05-09 16:48:48 -07:00
2026-05-09 16:48:48 -07:00
2026-05-09 16:54:45 -07:00
2026-05-09 16:54:45 -07:00
2026-05-09 16:41:46 -07:00
2026-05-09 17:17:19 -07:00
2026-05-09 17:17:19 -07:00
2026-05-09 17:21:33 -07:00
2026-05-09 16:52:52 -07:00
2026-05-09 16:52:52 -07:00
2026-05-09 14:34:05 -07:00
2026-05-09 17:03:21 -07:00
2026-05-09 17:03:21 -07:00
2026-05-09 16:56:07 -07:00
2026-05-09 16:56:07 -07:00
2026-05-09 14:34:05 -07:00